Completed the moving of tools from the storage container to the house.
Sorted through 90% of my garage boxes so I could have my tools (still missing my crow bars).
All the cabinets down from the kitchen.
80% of drywall down from the kitchen.
Dining room-kitchen wall down.
Plumbing and electric from kitchen down, capped off.
Jen ordered the cabinets today, picture here of the exterior wall.
Our fireplace works, we started burning the wood from the demolition in it. We will be burning the cabinets for a few days. The cabinets we removed were built in place, piece by piece. It probably took the cabinet maker over a week to build it, we had it down inside of four hours.
Sorry for the lack of photos, but I'm not driving back.
2 comments:
not having looked at the floor plan in a while, will there be a window in the kitchen by the sink?
why did you decide to go with the sink at the end vs. stove at the end?
brooklyn barrister
There will be a window (8' wide) above the sink. Workspace around the sink is probably why we put it there and not where the stove is.
Look down further on the page, the floor plans are there.
Don't be afraid of the weather.
Post a Comment