Billn is back at his normal job, so all work is second shift. Tonight he put a second coat of joint compound on the second floor patches and did a lot more electrical rough work there. All the electric power cables on the second floor are stripped and in boxes. Also, the most crowded switch box on the first floor is stripped and in a box. Finally, all the cables are pulled in the living room.
Billn also repaired (for the second time) a leaky pipe. Again, reusing pipes (which is environmentally friendly) is a good deed and was punished by a leak.
Jenm purchased the paint for the homemade siding.
Tomorrow cables go to the craft/guest and toy rooms.
Billn will return the copper tubing ($2.00+ per foot for 1/2"); we ordered PEX tubing ($0.30 per foot) and fittings last night.
No pictures today, there is nothing exciting about wires and cables in junction boxes.
Subscribe to:
Post Comments (Atom)
2 comments:
speak (type?) for yourself. i like pictures. i am simple-minded. pictures. pictures. pictures.
The post of 05/03/2007 had lots of pictures, imagine the electrical rough in pictures for the last two weeks.
Post a Comment